Darquain Oil Field Development-Phase II

   

Location: Darquain - South of Iran

Plant Capacity: Oil Processing of 160,000 bbl/d

Client: ENI of Italy

Completion Date: 2010















Azadegan Oil Field Development

   
 

Location: Azadegan - South of Iran

Scope: 38 well locations and access roads

Client: NIOC - PEDEC

Completion Date: 2010

















AMAK Gas Gathering & Treatment Project

   

Location: Ahwaz, Maroon, Mansuri, Abteymour, Kupal - South of Iran

Plant Capacity: 242 MMSCFD including Compressor Stations, Gathering and Transmission Lines, Sweetening, Treating Plant

Client: NIOC

Completion Date: 2006
















Borzouyeh Petrochemical Complex (4th Aromatic)

   
 

Location: Assaluyeh - South of Iran

Plant Capacity: 4,479,000 TPY of Aromatics and gas processing of 240 MMSCFD

Client: NPC

Completion Date: 2006
















Dorood Onshore Surface Facilities

   

Location: Kharg Island - Persian Gulf

Plant Capacity: 80,000 bbl/d of oil production, 240 MMSCFD of gas processing, 270,000 bbl/d at 235 Bar of water injection, 130 MMSCFD at 410 Bar of gas injection and 40 MMSCFD of gas sweetening

Client: TOTAL of France

Completion Date: 2005

















Bidboland NGL-1600 Project

   

Location: Behbahan - South of Iran

Plant Capacity: 600 MMSCFD

Client: National Iranian South Oil Fields Company

Completion Date: 2004














Darquain Oil Field Development Project-Phase I

   
 

Location: Darquain - South of Iran

Plant Capacity: Oil Processing of 50,000 bbl/d

Client: ENI of Italy

Completion Date: 2004















Parsian Gas Refinery Project

   
 

Location: Lamerd - South of Iran

Plant Capacity: 890 MMSCFD of gas

Client: NIGC

Completion Date: 2003















Fajr Petrochemical - Water Treatment Project

   

Location: Mahshahr - South of Iran

Capacity Treating: 7,000 m3/hr of water

Client: NPC

Completion Date: 2001














Revamping of Crude Oil Storage Tank with Double Deck Floating Roof

   
 

Location: Sirri Island - Persian Gulf

Capacity: 1 million barrels

Client: Iranian Offshore Oil Company (IOOC)

Completion Date: 2001
















Sirri A&E Field Development Project

   
 

Location: Sirri Island - Persian Gulf

Plant Capacity: 100,000 bbl/d of oil processing and 90 MSCFD of associated gas

Client: TOTAL of France

Completion Date: 2000
















Ahwaz 48” Potable Water Pipeline Project

   
 

Location: Ahwaz - South of Iran

Capacity: transferring 35,000 GPM of water

Client: Iran Ministry of Power

Completion Date: 2000
















Abouzar Oilfield Development Project

   
 

Location: Persian Gulf

Capacity: 100,000 bbl/d, topside AA and AC Abouzar offshore production platforms with a total weight of 4,600 tons

Client: NIOC-IOEC

Completion Date: 2000
















Bandar Abbas Oil Refinery Project

   
 

Location: Bandar Abbas - South of Iran

Plant Capacity: 33,000 bbl/d including Asphalt Blowing and Visbreaker units

Client: NIOC

Completion Date: 1998
















Moghan Drainage and Irrigation Network Project

   

Location: Parsabad of Moghan - Northwest of Iran

Scope: Land Grading in an area of 22,000 Hectares and Construction of a water distribution and sub-surface drainage network together with 300 km of prefabricated concrete canals

Client: Iran Ministry of Agriculture

Completion Date: 1997
















Tabriz Petrochemica Complex - Polyethylene

   
 

Location: Tabriz - Northwest of Iran

Plant Capacity: 100,000 TPY of Polyethylene

Client: NPC

Completion Date: 1997
















Hormozgan Cement Plant Project

   
 

Location: Bandar Khamir - South of Iran

Plant Capacity: 3,000 TPD

Client: Ehdas Sanat Co.

Completion Date: 1997
















Bibihakimeh and Rag- E - Sefid Gas Injection Project

   
 

Location: Aghajari and Gachsaran - South of Iran

Capacity: 270 MMSCFD gas injection and 440 km gas gathering and injection lines

Client: NIOC

Completion Date: 1996
















Rasht-Neka 30” Gas Transfer Pipeline

   
 

Location: Rasht to Neka - North of Iran

Capacity: Transferring 420 MMSCFD

Client: NIGC

Completion Date: 1993
















Mobarakeh Hot Stripping Mill Plant Project

   
 

Location: Mobarakeh - Central Iran

Plant Capacity: 1.2 Million TPY

Client: Ministry of Mines and Metals   

Completion Date: 1992