Location: Rasht - North of Iran
Project description:
Scope of work:
-
Construction of
30” gas transfer pipeline from Lakan to Sadat Mahaleh consisting of:
-
125 km of 30” pipeline
in aquifer lands.
-
Construction of
121 km of sub-grade for right of way for passing aquifer lands with natural
aggregates of 1.4 million m3.
-
14 units
branch-off stations
-
5 units
cathodic protection stations
-
620 river
crossing, road crossing, channel crossing, including Sepidrood main river
crossing with a width of 1 km.
-
Construction of
5 km of Concrete-Continuos-Coating.
-
Installation of
more than 7,000 Set-On-Weight.
-
Installation of
2 launcher receiver at the beginning and the end of the line.

Duration of work : 24
months
Completion date : March, 1991
©2006 JAHANPARS Co. All Rights Reserved.
|